custom ceramic coffee mugs manufacturers
ABOUT CERAMIC MUG DESIGN MUG BLOG CONTACT
Custom Ceramic Mugs[950]
Custom Ceramic Mugs[960]
Custom Ceramic Mugs[970]
Custom Ceramic Mugs[980]
Custom Ceramic Mugs[990]
Custom Ceramic Mugs[1000]
Xin Xiang Ceramic Mug Manufacturer Co.,Ltd
Skype:xxceramic
Add:Shandong,China
E_mail:
fanny@ceramic-mug.cn
xinxiangmug@gmail.com
Tel: +86 151 6506 6178
Fax: +86 531 81901306
Whatsapp: +86 15165066178
WeChat:
 
  Now : Home > Ceramic Mug News

Ceramic advertising cup mug,promotional cup mug

Ceramic Mug    From:Xinxiang Ceramic Mug Manufacturers     2016-3-9
(a) range
Quality system requirements custom ceramic mug specified in this international standard, is used for the supplier confirms its ability during the final inspection and testing to detect and control the product nonconformities and disposal.
This standard applies to the following environment, that only when thesupplier can provide enough evidence to prove that the inspection and test the ability of the final product, to believe that the product conforms to specified requirements.
(two) the reference standards
Effective version of the following standards are referenced in this international standard time of publication, constitute a part of this standard. By all standards will be revised, so to encourage the parties touse this standard, the latest version of the following standards as soon as possible. The IEC and ISO members are holders of existing effective international standard.
The ISO8402:1994 quality management and quality assurance --vocabulary.
Note 2 products including services, hardware, software, flow of material,or a combination of them.
Note 3 products can be visible (such as component or process material)or intangible (such as knowledge or concept) or a combination of them.
Note 4 used by the term "product" applies only to the product intended to provide, not a by-product of environmental impact of involuntary.
The definition of it and the ISO8402 difference.
2 the supplier to meet the requirements of product contract tender offer.
3 of the contract both sides of supply and demand in any manner agreedprovisions.
(four) the quality system requirements
1 management responsibility
(1) the quality policy for decision-making responsibilities of supplier management, should set the quality policy and quality objectives, to make a commitment to quality, and document.
(1) the quality policy for decision-making responsibilities of supplier management, should set the quality policy and quality objectives, to make a commitment to quality, and document.
The quality policy should reflect the organizational goals and customer expectations and requirements.
The supplier shall ensure that the organization of all staff at all levels to understand the quality policy, and adhere to the implementation of. (2)the organization The responsibility and authority to manage, perform and verify work personnel in accordance with the requirements of this international standard, especially to the independent exercise of powersof personnel, should be written the provisions of responsibility, authority and the mutual relations, so that:
A) for final inspection and test;
B) ensure that does not meet the requirements of product is not used or not delivery.
The resource supplier shall determine resource requirements andprovide adequate resources, including the assignment of trained personnel engaged in the management, implementation and validation activities, including internal quality audit.
The management representative responsible for the decision-making responsibilities of supplier management, shall appoint a management representative.
The management representative responsible for the decision-making responsibilities of supplier management, shall appoint a management representative.
No matter how his other responsibilities, should make clear the followingfunctions and powers: A) ensure the establishment, in accordance with the standard operation and maintenance of the quality system;
B) operation managers report to supplier quality system, in order to review and improve the quality system.
Note 5 the management representative duties may also include supplier quality system and external agencies.
(3) the management review for decision-making responsibilities of supplier management, should regularly review the quality system, to ensure sustained and effectively meet the quality policy and objectives of this international standard requirements and the requirements.
Shall maintain records. 2 quality system
(1) general the supplier shall establish and maintain a quality system and documentation, to ensure that the products meet the requirements, the supplier shall prepare the quality manual covering the requirements of this international standard.
(1) general the supplier shall establish and maintain a quality system and documentation, to ensu, re that the products meet the requirements, the supplier shall prepare the quality manual covering the requirements of this international standard. The quality manual shall include or reference to the quality system procedures, and an overview of the file structureused in the quality system.
Note 6 ISO10013 provides guidance for the preparation of qualitymanual.
(2) quality system procedures shall be:
A) written procedures consistent quality policy formulation and the requirements of this standard and the;
B) effective operation of the quality system, execution of written procedures. The purposes of this standard, method scope of part of a quality system quality system procedures involved and the details should be complexity, depends on the work of the staff to complete these activities and the required skills and training. Note 7 written procedurescan refer to instructions how to complete an activity.
(3) the quality planning the supplier shall identify the final products meetquality requirements, and document. Quality planning shall be consistent with all other requirements of the supplier's quality management system,and to the use of the form file. The supplier shall give consideration tothe following activities:
A) quality planning for final inspection and test;
B) and equipped with in order to achieve the specified qualityrequirements may require all final inspection and test equipment,resources and skills;
C) when necessary, update the final inspection and testing technology;
D) measurement requires identification of all final inspection and testing,including the emerging technology level, but the ability to measure thetime limit can be enough development; "
E) identified in the verification stage appropriate final product;
F) for all features and requirements, including subjective evaluationcontains provisions, acceptance criteria;
G) identifying and preparation of quality records.
Note quality plan 8 concerned can use written procedures for reference,the appropriate form, the program is part of the quality system.
3 the contract review
(1) general provisions shall be written procedures for formulation and implementation of the contract review and coordinate the review activity.
(2) review for the submission of tenders, or the signing of the contract, oraccept orders (the demand), the supplier shall the tender, contract ororder review, to ensure that the:
A) has defined and documented requirements are appropriate; inverbally received the order, no written instructions to the requirements of the occasion, the supplier shall ensure that the order requirements areagreed before its acceptance.
B) timely payment or use to recover from all places of failure and / or obsolete documents, or to prevent misuse these failure and / or obsolete documents. "
C) any obsolete documents retained for legal and / or the purpose of the accumulation of knowledge should be appropriately identified.
(3) document and data changes unless there are special provisions, the original approval document and data change approval should be the filedepartment / organization. If the specified other departments /organizations for approval, the Department / organization shall obtain the relevant background material on the basis of the original approval.
When feasible, should be in the file or the corresponding attachment marked change the nature.
6 purchase of this international standard does not include requirements of the quality management system of procurement. The verification can not reduce the customers with qualified products liability.
8 product identification and traceability traceability is a requirementstipulated in the specific identification, supplier shall each or each batch of product develop and implement written procedures. The marking should be recorded. This international standard does not include the 9process control requirements of the quality system process control.
Previous : Shape Ceramic Mugs what advantages and disadvantages of poro
Next : Daisy-used ceramic mugs products The characteristics of cera
Ceramic Mugs|Ceramic coffee Cups|Stoneware Mugs|Porcelain Mugs|Double wall Cups|Bone China Mugs
Xinxiang Ceramic Mug Manufacturer Co.,Ltd Add:Shandong,China Ceramic Mug Catalog
Skype:xxceramic   Tel: +86 151 6506 6178   Fax: +86 531 81901306   WhatsApp:+86 151 6506 6178
E_mail:fanny@ceramic-mug.cn xinxiangmug@gmail.com Msn: wfxfanny@hotmail.com 鲁ICP备13027628号
White Ceramic Mugs Wholesale Sublimation Mugs Supplier Custom Ceramic Coffee Mugs Ceramic Mug Manufacturers